(Downloading may take up to 30 seconds.
If the slide opens in your browser, select File -> Save As to save it.)
Click on image to view larger version.

Fig. 5. Comparison of timing and magnitude of the observed and calculated forces
exerted by largemouth bass on tethered prey. Time 0 (A) is the first frame
digitized in the image sequence (
10 frames prior to the onset of gape,
arbitrarily selected for each sequence). The timings of the observed and
calculated peak force were linearly correlated (mixed-effects model,
R2=0.659; F1,23=50.6,
P<0.001), with the timing for observed peak force preceding that
of the expected force (slope=0.66). Similarly, the peak calculated force was
correlated with the observed one (mixed-effects model,
R2=0.68; F1,23=55.74,
P<0.001) and a slope of 1.02 (B). Different symbols represent data
for the four fish studied, diagonal line represents the case of
x=y.