(Downloading may take up to 30 seconds.
If the slide opens in your browser, select File -> Save As to save it.)
Click on image to view larger version.

Fig. 4. Cumulative work done during 10 contractions in the protocols described in
the Materials and methods and in Fig.
3. `I', shortening contractions preceded by an isometric phase;
`S', shortening contractions preceded by a stretch; `shorten', the work done
during the shortening portion of the contraction; `net', the net work done
during the entire contraction (note: for contractions preceded by an isometric
phase, net work equals shortening work); `stretch', the work required to
stretch the muscle. Work is expressed relative to muscle mass. Values are
means ± s.e.m. P values are comparisons with I-shorten using
work values uncorrected for muscle mass.