(Downloading may take up to 30 seconds.
If the slide opens in your browser, select File -> Save As to save it.)
Click on image to view larger version.

Fig. 7. The time course of torque production during a saccade by a magnetically
tethered fly. Velocity and acceleration data were drawn from the saccades
falling in a single bin of Fig.
3C (amplitude=17.5°, peak velocity=379° s-1,
n=108 saccades), rectified and aligned to the time when the angular
velocity exceeded one-quarter of its maximum value. The shaded area indicates
the s.e.m.