Fig. 8. Pitch-up phase of gliding perching sequence (A), leading into deep stall
(B–D). Time interval between frames: 40 ms. Red brackets show extent of
deflection of the secondary upperwing coverts. An animation of the complete
sequence at 500 frames s–1 is provided in supplementary
material Movie 8.