(Downloading may take up to 30 seconds.
If the slide opens in your browser, select File -> Save As to save it.)

Click on image to view larger version.


Figure 8


Fig. 8. Relative time spent shortening (grey) and lengthening (black), expressed as a proportion of the total time of the lengthen–shorten cycle of the ILPO (A) and the FT (B). Relatively more time was spent shortening as the demand for mechanical work increased with increasing slope.